

The environment of the project site is not ideal, it is difficult to guarantee the cleanliness of the optical fiber, and the construction quality cannot be guaranteed.
The traditional box closed for a long time, resulting in the aging and contamination of the connector; problems such as irregular wiring cause a lot of weak optic problems
Requiring repeated construction by the engineering team, low efficiency and high cost

Designed for connection between OCC and Hub Box, supporting cable splicing, pre-connectorized connection, and mid-span splicing.
An intermediate distribution node between Hub Box and End Box, pre-installed with PLC splitters for fiber splitting and downstream distribution.
Designed for FTTH customer-side fiber entry and distribution, supplied pre-installed for quick field deployment.
ZTT’s self-developed solution supports Corning, Furukawa, Huawei, and N-in-1 configurations, with up to IP68 protection and 600 N tensile strength.







-反白-1024x290.png)
Connecting the World
Powering the Future
Products
Quick Link